30 January 2015

MEGA BLOCK ON Central Railway 1.2.2015

MEGA BLOCK o­n 1.2.2015
Central Railway will operate Mega Block o­n its suburban sections for carrying out maintenance work o­n  1.2.2015: -
MATUNGA-MULUND DN SLOW LINE FROM 11.30 AM TO 3.30 PM
All Dn slow services leaving Matunga from 11.00 am to 3.23 pm will be diverted o­n Dn fast line between Matunga and Mulund stations halting at Sion, Kurla, Ghatkopar, Vikhroli, Bhandup and Mulund stations and further re-diverted to Dn slow line at Mulund station. DN slow line services will not be available at Vidhyavihar, Kanjurmarg and Nahur stations. Passengers travelling to these stations will be permitted to travel via Ghatkopar, Bhandup and Mulund.
All Up fast services leaving Thane from 10.46 am to 3.28 pm will halt at Mulund, Bhandup, Vikhroli, Ghatkopar and Kurla stations in addition to their respective scheduled halts and will arrive destination 15 minutes behind schedule. All Dn fast services leaving Chhatrapati Shivaji Terminus Mumbai from 10.08 am to 2.42 pm will halt at Ghatkopar, Vikhroli, Bhandup and Mulund stations in addition to their respective scheduled halts and will arrive destination 20 minutes behind schedule.
All slow services arriving and leaving Chhatrapati Shivaji Terminus Mumbai between 11.00 am and 4.00 pm will arrive destination 10 minutes behind schedule.
KURLA - CHHATRAPATI SHIVAJI TERMINUS UP HARBOUR LINE & VADALA ROAD-MAHIM UP AND DN HARBOUR LINES FROM 11.30 AM TO 3.30 PM All DN harbour line services to Bandra / Andheri leaving Chhatrapati Shivaji Terminus Mumbai from 10.20 am to 3.33 pm and UP harbour line services for Chhatrapati Shivaji Terminus Mumbai leaving Bandra / Andheri from 10.40 am to 3.17 pm will remain suspended.
UP Harbour line services to Chhatrapati Shivaji Terminus Mumbai leaving Kurla from 11.08 am to 3.20 pm will run via Main Line o­n UP fast  line up to Byculla halting at Sion, Matunga. Dadar and Parel stations and further o­n UP slow line between Byculla and Chhatrapati Shivaji Terminus Mumbai stopping at all stations.
All Up and Dn Harbour line services arriving and leaving Chhatrapati Shivaji Terminus from 11.00 am to 5.00 pm will arrive destination 10 minutes behind schedule.Harbour line passengers for Bandra/ Andheri are permitted to travel via Main Line and Western Railway from 10.00 am to 6.00 pm.