4 July 2012

Introduction of New Trains - Express and Passenger for the year 2012


INTRODUCTION OF TRAINS:
1) Train No. 16561/16562 Yesvantpur – Kuchuveli – Yesvantpur AC Weekly Express
Abstract Timings:
Train No. 16561
YPR - KCVL
AC Weekly Express
A/D
Station
A/D
Train No.16562
KCVL – YPR
AC Weekly Express
(Thu) 15.25 D Yesvantpur A (Sat) 04.30
18.30 T Jollarpettai (A) T 01.50
(Fri) 06.50 A Kuchuveli. D (Fri) 12.50
The Detail timings are available in Time Table which will come into effect from 01.07.2012.
Composition: LWLRRM 2+LWACCW 3+LWFAC 1+LWACCN 9 = 15 Coaches
Rake Requirement: NIL ( Lie over Rake of Train No. 12213/12214 YPR – DEE – YPR Duranto Express Duly
shifting Primary Maintenance from DEE (NR) to YPR (SWR) & revising Days of service of Train No. 12214 Express
Ex DEE to Mondays instead of Wednesdays).
Primary Maintenance: Yesvantpur; Secondary Maintenance: DEE: PFTR KCVL.
Commercial Stoppages:
KJM.SA, ED, Tiruppur, CBE, Pallakad, Tiruchur, Ernakulam Town, Kottayam, Chenganur,
Kollam
Date of introduction will be advised later.
2.) Train No.16217/16218 Mysore – Sai Nagar Shirdi – Mysore Weekly Express.
Abstract timings:
Train No.16217
MYS - SNSI Express
Stations
Train No.16218
SNSI - MYS Express
(Mon)(D) 05.30 Mysore (A) 06.55 (Thu)
08.15/08.25 Bangalore City 03.50/04.00
(D) 12.25 Dharmavaram (D) 23.10
15.50/15.55 Bellary 19.48/19.50
02.35 Hotgi 09.28/09.30
03.50/04.00 Solapur 08.38/08.40
(A) 11.30 (Tues) Shiridi (D) 23.55 (Tues)
The Detail timings are available in Time Table which will come into effect from 01.07.2012.
Composition : 2ACCW +2ACCN+11GSCN+3GS+2SLR =20
Coaches.
Rake Requirement : Nil (Lie- over rake of 16209/16210 Express)
Primary Maintenance : Primary MYS with RBPC. (PFTR: SNSI)
Stoppages : Mandya, Kengeri, BangaloreCity, Bangalore Cantt,
Yelahanka, Hindupur, Dharmavaram, Anantapur,
Guntakal, Bellary, Hospet, Koppal, Gadag, Bagalkot,
Bijapur, Solapur, Kurdwadi, Daund, Ahmednagar,
Belapur and Puntamba
Date of introduction will be advised later.
3.) Train No. 56215/56216 Mysore – Shravanabelagola – Mysore daily Passenger.
Abstract timings are as under:
T.No.56215 MYS-SBGA Station T.No.56216 SBGA -MYS
D : 11.35 Mysore A : 20.05
14.05/14.10 Hassan 17.00/17.10
A : 15.20 Shravanabelagola. D : 15.50
The Detail timings are available in Time Table which will come into effect from 01.07.2012.
Composition : 8 GS +2 SLR =10 Coaches.
No of rakes required : NIL ( Lie over Rake of Train No.56205/56206 Pass.)
Stoppages : KRNR, HLN, HAS, SIGA, DSVS, and CNPA.
Primary Maintenance : Primary MYS with RBPC. (PFTR: SBGA)
Date of introduction will be advised later.
4) Train No. 56208/56207 Mysore – Chamrajanagar – Mysore daily Passenger.
Abstract timings are as under:
T.No.56208 MYS-CMNR Station T.No.56207 CMNR -MYS
14.45 Dep Mysore 18.30
15.30/15.45 Nanjanagud 17.43/17.45
Arr 16.40 Chamarajanagar Dep 16.55
The Detail timings are available in Time Table which will come into effect from 01.07.2012.
Composition : 9 GS +2 SLR =11 Coaches.
No of rakes required : NIL ( Lie over Rake of Train No.56203/56212 Pass.)
Primary Maintenance : Primary MYS with RBPC. (PFTR: CMNR)
Days of service : Daily
Stoppages : All Stations enroute.
Date of introduction will be advised later.
5) Train No. 56275/56276 Mysore – Birur – Mysore daily Passenger
The Abstract timings are as under:
56275 RRB – MYS Passenger Station 56276 MYS – RRB
Passenger
08.00 Dep Birur 20.50 Arr
09.10/09.15 Arasikere 18.25/18.30
10.03/10.05 Hassan 17.08/17.10
13.25 Arr. Mysore. 15.00 Dep
The Detail timings are available in Time Table which will come into effect from 01.07.2012.
Composition : 10 GS +2 SLR =12 Coaches.
No of rakes required : ONE (One Rake of the above Composition to be
Supplied by Railway Board.)
Primary Maintenance : Primary ASK with RBPC. (PFTR: RRB)
Stoppages : Stoppage at all stations enroute except at halt stations.
Date of introduction will be advised later.
6.) Train No. 22625/22626 Chennai – Bangalore – Chennai Double Decker Daily Express
Abstract Timings.
Train No. 22625
MAS – SBC Express Station Train No. 22626
SBC – MAS Express
07.25(D) MAS 20.45(A)
(D) 10.45 JTJ (D) 17.05
(A) 13.30 SBC (D) 14.40
The Detail timings are available in Time Table which will come into effect from 01.07.2012.
Composition : WLLRM 2+LWCZDAC 11 =13 Coaches.
Primary Maintenance : Primary Chennai with RBPC. (SBC : PFTR )
Stoppages : BNC,KJM,BWT,JTJ,Ambur,KPD,AJJ
Date of introduction will be advised later.
7) Train No. 19301/19302 Indore - Yesvantpur – Indore Weekly Express.
Abstract Timings.
19301 INDB – YPR Exp Station 19302 YPR – INDB Exp
21.25(D) Sun INDB 05.00(A) Thur
(D) 07.25 DMM (D) 17.05
(A) 11.15 (Tue) YPR Tue (D) 13.30
The Detail timings are available in Time Table which will come into effect from 01.07.2012.
Days of service : Ex Indore on Sundays Ex Yesvantpur on Tuesdays.
Composition : WLLRM 2+LS 6+LWSCN 7 + LWACCN 3+LWACCW 1 =19
Coaches.
Primary Maintenance : Indore. RBPC. (YPR: PFTR) (LHB Coaches with 4500
RBPC)
Stoppages : YNK over SWR.
Date of introduction will be advised later.
8) Train No. 22133/22134 Solapur – Yesvantpur – Solapur Tri Weekly Express
Abstract Timings.
Train No. 22133
YPR - SUR Express Station Train No.22134
SUR – YPR Express
20.50 Dep YPR 07.10 Arr.
23.40/23.45 DMM 04.05/04.10
05.40/05.42 WD 22.00/22.02
06.10/06.15 GR 21.25/21.30
08.15 Arr. SUR 19.45 Dep
The Detail timings are available in Time Table which will come into effect from 01.07.2012.
Days of Service Ex. YPR on Tue, Thu, Sat & Ex. SUR on Mon, Wed, Fri.
Primary Maintenance: Sholapur (RBPC)
No. of Rakes: One
Composition.1 FCWAC, 1ACCW, 1ACCN, 7 GSCN, 6GS, 2SLR = 18 Coaches.
Commercial Stoppages: GA, WD, RC, MALM.Adoni, GTL, ATP, DMM, YNK.
Date of introduction will be advised later.
9.) Train No. 22883/22884 Puri – Yesvantpur – Puri Weekly Garibrath Express.
Abstract Timings.
Train No. 22883
PURI – YPR Weekly
Garibrath Express.
Station
Train No. 22884
YPR – PURI Weekly
Garibrath Express.
14.30 (D) Fri Puri 05.50(A) (Mon)
23.00 Visakhapatnam 22.40
05.20 Vijayawada 13.40
(D) 16.00 Dharmavaram (D) 02.45
(A) 20.00 (Sat) Yesvantpur (D) Sat 22.40
The Detail timings are available in Time Table which will come into effect from 01.07.2012.
Days of Service Ex. PURI on Fri. & Ex. YPR on Sat
Primary Maintenance: Puri (RBPC) PFTR : YPR
Composition.16ACCNH +2WLLRM = 18 Coaches.
Date of introduction will be advised later.