31 August 2014

Details of Change in Timings, Withdrawal of Halts, Change in Terminus - Salient Features of Timetable 2014

SALIENT FEATURES OF MAIN LINE TIMETABLE - 2014

Change In Timings with effect from 1.11.2014



11003 Dadar-Sawantwadi Road Rajya Rani Express with effect from 1.11.2014  will leave Dadar at 0005 hrs (instead of 2355 hrs) and will arrive Thane at 0027 hrs and leave at 0030 hrs There is no change in arrival at Sawantwadi Road of this train i.e. 1125 hrs same day.



51293 Nagpur-Amla Passenger will leave Nagpur at 1805 hrs (instead of 1815 hrs) from 1.9.2014 and arrive Amla at 2230 hrs same day (instead of 2240 hrs)



17614 Hazur Sahib Nanded-Pune Express will leave at 2120 hrs from 1.9.2014 (instead of 2100 hrs) and arrive Pune at 1100 hrs as at present



WITHDRAWAL OF HALTS



With effect from 1.9.2014 following trains will not halt at Sirsuphal

51323/51324 Daund-Baramati-Pune Passenger
51451/51452 Pune-Baramati-Daund Passenger
51327/51326 Daund-Baramati-Pune Passenger
51347/51348 Pune-Baramati-Daund Passenger


With effect from 1.9.2014 following trains will not halt at Rohini

51181/51182 Devlali-Bhusaval-Devlali Passenger
51153/51154 Mumbai-Bhusaval-Mumbai Passenger


With effect from 5.9.2014 following trains will not halt at Bohali

22145/22146 Pandharpur-Miraj-Pandharpur Express


Change in Terminus from 1.11.2014



12051/12052 Mumbai-Madgaon-Mumbai Janshatabdi Express will terminate and depart from Karmali with effect from 1.11.2014



Acceleration of mail/express train o­n Central Railway System from 1.9.2014



36 mail/express trains have been speeded up o­n Central Railway system ranging from 5 minutes to 35 minutes (average acceleration 10 minutes) with effect from 1.9.2014.



51154 Bhusaval-Mumbai Passenger is speeded up o­n Igatpuri-Chhatrapati Shivaji Terminus Mumbai section by 1 hour and 5 minutes with effect from 1.9.2014.