9 October 2014

Cancellation & Partial Cancellations of Trains due to Line Block on Guntur-Tenali Section

SCR  will impose line block between Guntur-Tenali section for carrying out track renewal works o­n  Tuesday, Thursday and Saturday in a week  for a period of o­ne month from 11th October, 2014 to 11thNovember, 2014.
As a result of the line block, the following trains will be fully cancelled / partially cancelled  o­n Tuesdays, Thursdays and Saturdays from 11th October to 11thNovember, 2014.
1)Trains Fully Cancelled

a)Train No.77282 Tenali-Guntur Passenger is fully cancelled.

b)Train No.67255 Guntur-Tenali Passenger is fully cancelled.

2)Trains Partially Cancelled
a)Tr.No. 77223 Repalle-Guntur Passenger is partially cancelled between Tenali and Guntur
b)Tr. No.77224 Guntur-Repalle Passenger is partially cancelled between Guntur   and Tenali.