South Eastern Railway has decided that with the opening of the new halt station “BOKRA” in between Mathnashipur and Rainagar on 01.05.17, the existing two pairs of Passenger trains viz. 78023/78024 and 78025/78026 Mathnashipur-Bankura-Mathnashipur DEMU Passenger will have one minute stoppage at Bokra w.e.f 01.05.17.
78023 Mathnashipur-Bankura DEMU Passenger will reach Bokra at 05.49 hrs and in the return direction, 78024 Bankura-Mathnashipur DEMU Passenger will arrive Bokra at 10.29 hrs with one minute stoppage in both the directions.
78025 Mathnashipur-Bankura DEMU Passenger will reach Bokra at 10.49 hrsand in the return direction, 78026 Bankura-Mathnashipur DEMU Passenger will arrive Bokra at 21.49 hrs with one minute stoppage in both the directions