During the midnight of 30th & 31st January, 2016, a jumbo block of 5 hours will be taken from 00.05 hrs to 05.05 hrs at Borivali South Yard of Line 1, 2 & 3 and a block of 2.45 hours at same yard on Line 4 i.e. Dn through line from 02.00 hrs 04.45 hrs for Girder Launching of 6m wide FOB situated at Borivali (South) for trespassing control.
During the block some local trains will remain cancelled. The list of which will be available at all stations. Also down slow line trains will run on down fast lines between Goregaon and Borivali and up slow line trains will run on up fast lines between Bhayander and Goregaon. During the block, all Borivali terminating/originating trains will be dealt only from PF No.8. Therefore, there will not be any Day Block on Western Railway on Sunday, 31st January, 2016.
During the block some local trains will remain cancelled. The list of which will be available at all stations. Also down slow line trains will run on down fast lines between Goregaon and Borivali and up slow line trains will run on up fast lines between Bhayander and Goregaon. During the block, all Borivali terminating/originating trains will be dealt only from PF No.8. Therefore, there will not be any Day Block on Western Railway on Sunday, 31st January, 2016.