11 March 2016

REVISION OF TIMINGS OF TRAIN NO. 56907 HUBBALLI-DHARWAD PASSENGER

REVISION OF TIMINGS OF TRAIN NO. 56907 HUBBALLI-DHARWAD PASSENGER
WITH EFFECT FROM 18TH MARCH, 2016

South Western Railway has permitted Hubballi Division to revise the existing timings of Train No. 56907 Hubballi-Dharwad Passenger, with effect from 18th March, 2016.The existing timings are indicated in brackets.

Accordingly, Train No. 56907 Hubballi-Dharwad Passenger will depart at Hubballi station at 18-55 hrs. instead of 18-25 hrs. and arrive at Dharwad at 19-35 hrs. instead of 19-10 hrs., with effect from 18th March, 2016.

En route, the Passenger train will arrive/depart at Unkal at 19-03/19-04 hrs.(18-32/18-33); Amargol at 19-12/19-13 hrs. (18-39/18-40) and arrive/depart at Navuluru at 19-20/19-21 hrs.(18-46/18-47), with effect from 18th March, 2016.