Closure of Mumbai-end Foot Over Bridge at Kalyan for Repairs
Mumbai-end Foot Over Bridge (3.3 meter width) connecting platform 1, 1-A, 2 to 7 at Kalyan railway station will be closed for replacing of precast deck slabs from 1.8.2016 to 15.9.2016 and hence will not be available for use of passengers. However, Lokgram Foot Over Bridge will be available at the station. Passengers are requested to bear with the Railway Administration for the inconvenience caused.
Mumbai-end Foot Over Bridge (3.3 meter width) connecting platform 1, 1-A, 2 to 7 at Kalyan railway station will be closed for replacing of precast deck slabs from 1.8.2016 to 15.9.2016 and hence will not be available for use of passengers. However, Lokgram Foot Over Bridge will be available at the station. Passengers are requested to bear with the Railway Administration for the inconvenience caused.