Central Railway will operate night traffic block for launching of foot over bridge girders at Lokmanya Tilak Terminus platform Nos. 2 to 5 in the night of 3/4.5.2013 i.e. Friday/Saturday night -
ON LOKMANYA TILAK TERMINUS PLATFORM NOS. 2 TO 5 Between 23.00 hrs to 6.15 hrs on 3/4.5.2013 Fri-Sat night
RESCHEDULING OF MAIL/EXPRESS TRAINS on 4.5.2013
1. Train No. 15017 Dn Lokmanya Tilak Terminus – Gorakhpur Express is rescheduled to leave Lokmanya Tilak Terminus at 07.35 hrs (Scheduled dep. 06.35 hrs)
REGULATION OF MAIL/EXPRESS TRAINS on 4.5.2013
1. 11058 Up Amritsar – Lokmanya Tilak Terminus Express will be regulated at Ghatkopar loop and will arrive Lokmanya tilak Terminus 1’30” behind schedule.
2. 12545 Up Darbhanga – Lokmanya Tilak Terminus Karmabhoomi Express will be regulated at Bhandup loop and will arrive Lokmanya Tilak Terminus 40” behind schedule.